Esta web utiliza cookies técnicas, de personalización y de análisis, propias y de terceros, para anónimamente facilitarle la navegación y analizar estadísticas del uso de la web. Obtener más información
Resultados de búsqueda
-
The F/A-18 F404 Engine: Getting Lean (A) and (B) - Teaching Note
Brownlee, E. Richard II; Cross, Tom; Osterhoudt, Robert; Jaynes, C. J.; Pottinger, JeffNota del Instructor DARDEN-C-2268TN-EContabilidad y controlTeaching note for product C-2268Desde 0,00 €
-
Office Depot E-Business (Abridged)
Venkataraman, S.; Bodily, Samuel E.; Cross, Tom; Chatterjee, SayanCaso DARDEN-BP-0524-EGobierno corporativoThis case is an excellent illustration of offline/online integration. Office Depot used its supply chain, systems integration, and existing offline channel strengths to overcome competitive online threats from pure Internet players and other office-products-category players. Students get to consider the critical strategic options for overall strategy, pricing, product line, promotion, and business integration.Desde 8,20 €
-
The F/A-18 F404 Engine: Getting Lean (A)
Brownlee, E. Richard II; Cross, Tom; Osterhoudt, Robert; Jaynes, C. J.; Pottinger, JeffCaso DARDEN-C-2268-EContabilidad y controlThe U.S. Navy Aircraft Intermediate Maintenance Depot (AIMD) Lemoore Power Plants Division (F404 engine maintenance) was a real mess. Not-Ready-For-Issue parts were everywhere. Division thru-put was poor, there were 30 F/A-18 aircraft with bare firewalls (no engines), the maintenance crews were working 12-hour days, manning was at 61% of authorized levels, reenlistment rates were an abysmal 50%, and crew morale was lousy. The Officer-in-Charge of...Desde 8,20 €
-
The F/A-18 F404 Engine: Getting Lean (B)
Brownlee, E. Richard II; Cross, Tom; Osterhoudt, Robert; Jaynes, C. J.; Pottinger, JeffCaso DARDEN-C-2269-EContabilidad y controlAfter the successful implementation of Lean manufacturing concepts at U.S. Navy Aircraft Intermediate Maintenance Depot (AIMD) Lemoore, particularly with regard to the maintenance processes for the F404 engine on the F/A-18 Hornet, these concepts have become the standard by which production across all AIMDs are measured. Now assigned to NAVAIR, the person responsible for these changes is eager to apply the lessons of AIMD Lemoore across the entir...Desde 5,74 €
-
Navy Marine Corps Intranet (NMCI): 2007 Update
Cross, TomCaso DARDEN-C-2270-EContabilidad y controlIn 2007 it was six years since NMCI had been launched as the largest intranet system ever with more than 650,000 users. This update provides a summary of the problems and issues raised by GAO in its December 2006 report, "DoD Needs to Ensure That Navy Marine Corps Intranet Program Is Meeting Goals and Satisfying Customers." For background, see Babson case BEE SP0805.Desde 8,20 €
-
Financial Impact of Nuclear Power Plants: Dominion Resources, Inc.
Allen, Brandt R.; Simko, Paul J.; Cross, TomCaso DARDEN-C-2234-EContabilidad y controlDominion Resources was the fourth-largest operator of nuclear power plants in the United States with seven nuclear reactors in operation. Two of the reactors had been acquired in the past five years: Millstone (2) in 2001 and Kewaunee in 2005. This case is about excellent due diligence and financial disclosure in acquiring major fixed assets (nuclear power plants) and the impact on the financial results and investor confidence.Desde 8,20 €
-
Financial Impact of Nuclear Power Plants: FirstEnergy and Davis-Besse
Allen, Brandt R.; Simko, Paul J.; Cross, TomCaso DARDEN-C-2232-EContabilidad y controlIn March 2002, during a scheduled refueling outage, workers at FirstEnergy's Davis-Besse nuclear power plant found a football-sized hole in the reactor head caused by boric acid corrosion. Redundant shielding prevented any radiation leakage, but FirstEnergy projected the outage would last two to three months and cost from $15 million to $30 million. Instead, the outage lasted 26 months and cost $588.9 million. Students will learn the financial i...Desde 8,20 €
-
Nuclear-Powered Aircraft Carrier Life-Cycle Cost Analysis
Cross, Tom; Sack, Robert J.; Pottinger, JeffCaso DARDEN-C-2282-EContabilidad y controlIn 1996, to find ways to reduce operating costs as well as the costs of future acquisitions, the Navy began to assess various design concepts for a new class of aircraft carriers and to analyze life-cycle costs, not just the acquisition costs, as life-cycle cost implications were complex and would significantly impact current and future budgets. The acquisition decisions for the next-generation aircraft carrier, CVX, would largely be determined o...Desde 8,20 €
-
Financial Impact of Nuclear Power Plants: PSEG and Hope Creek
Allen, Brandt R.; Simko, Paul J.; Cross, TomCaso DARDEN-C-2233-EContabilidad y controlThis case is about the financial impact of negative publicity and a company's reaction. A Public Service Enterprise Group had ownership interest in five nuclear power plants, three of which were located in Lower Alloways Creek, New Jersey. These three plants had been cited for concerns about a safety conscious work environment by a fired employee and the Nuclear Regulatory Commission. One U.S. senator and two congressmen had written a letter to N...Desde 8,20 €
-
Naval Supply Systems Command Change Management Support Solicitation: Bid or No-Bid (A)
Cross, Tom; Pottinger, JeffCaso DARDEN-S-0222-EDirección estratégicaCowan and Associates (C&A) provided strategic planning, business planning, change management, performance measurement, and knowledge management support to various Navy commands. Its managing director, Jeff Pottinger, was contemplating a Request for Proposal to provide change management support services to the Naval Supply Systems Command (NAVSUP) in Mechanicsburg, Pennsylvania. Pottinger was intimately aware of the significant change management c...Desde 8,20 €