This website uses technical, customisation and analytical cookies, both first-party and third-party, to anonymously facilitate browsing and analyse statistics on use of the website. Learn more
Search results
-
Ebola: Managing to Save Lives
IESE InsightArticle ART-2676-EService and Operations ManagementA year after the outbreak of Ebola in West Africa in March 2014, health-care experts are cautiously optimistic that the epidemic appears to be slowing. Although the outlook is brighter than a year ago when the first case was detected in Guinea, there is still a long way to go and many lessons to be learned in managing a crisis of this scale, related to institutional shortfalls, international coordination, engagement with local stakeholders and, m...Starting at €8.20
-
Team New Zealand (B) (Spanish Version)
Iansiti, MarcoCase HBS-602S09Service and Operations ManagementComplementa el caso (A). Para maximizar su eficacia, los casos de color deben imprimirse en color. Un resumen no está disponible para este producto. Incluye exhibiciones de color.Starting at €5.74
-
Team New Zealand (C) (Spanish Version)
Iansiti, Marco; MacCormack, AlanCase HBS-602S10Service and Operations ManagementSuplementos de la (A) y el caso (b).Starting at €5.74
-
Rural Electrification in Nicaragua (Abridged)
Shiekh, Tahir; Gomez-Ibanez, JoseCase HBS-HKS483-EService and Operations ManagementIn the fall of 2001, officials of the National Energy Commission of Nicaragua were reviewing a pilot study of the options for electrification in three rural communities. Rural electrification was an important issue in Nicaragua since 40 percent of the population, mostly in rural areas, was without power. Many of those lived too far from the main high-voltage grid to be served easily with grid extensions. The consultants were recommending subsidiz...Starting at €8.20
-
Ébola: cuando una buena gestión salva vidas
IESE InsightArticle ART-2676Service and Operations ManagementEl ébola se ha cobrado más de diez mil víctimas en apenas un año y durante varios meses la epidemia amenazó con extenderse sin control por todo el mundo. ¿Cuáles han sido los principales errores y escollos en la gestión de la crisis?Starting at €8.20
-
Las dificultades del cambio: el modelo de Seguridad Social nicaragüense en transición
La Forgia G. M.; Ribera, Jaume; Rosenmöller, MagdaCase P-1009Service and Operations ManagementUn consultor contratado para preparar un informe examinando la viabilidad de la aplicación de un esquema similar al del MSP (Modelo de Salud Provisional, ya funcionando dentro del INSS - Instituto Nicaragüense de Seguridad Social) a poblaciones pobres no cubiertas por el INSS, llega a la conclusión que el esquema aún no puede ser transferido ya que puede requerir mejoras urgentes e importantes. El caso describe el progreso del MSP: crecimiento de...Starting at €8.20
-
Team New Zealand (A) (Spanish version)
Iansiti, MarcoCase HBS-602S08Service and Operations ManagementThe case describes the development process used by Team New Zealand to design their two yachts for the 1995 America's Cup. During development, the team makes extensive use of simulation and physical prototyping to improve the initial design concept. As they approach construction, they must decide whether to build both boats at the same time and, if so, whether to vary their designs. The decision hinges on evaluating the benefits of different expe...Starting at €8.20
-
Growing pains: the Nicaraguan social insurance health model in transition
La Forgia G. M.; Ribera, Jaume; Rosenmöller, MagdaCase P-1009-EService and Operations ManagementA consultant who has been contracted to draw up a report examining the feasibility of applying a model similar to that of the MSP (provisional health model, already operating within the INSS - Nicaraguan Institute of Social Security) to poor populations not covered by the INSS, reaches the conclusion that the model is not yet transferable as it may require urgent large-scale improvements. The case describes the MSP's progress: a 160% growth in th...Starting at €8.20
-
America's Cup in 2013: Oracle Team USA vs. Emirates Team New Zealand (A)
McDonald, Rory; MacCormack, Alan; Ampelas, VanessaCase HBS-616045-EService and Operations ManagementFour teams across the world are furiously designing, building, testing, and learning to sail a boat that would be one of a kind, in order to win the 2013 America's Cup. Choosing the best development path was a challenge as the teams had less than three years to prepare, and each decision would affect the performance of the boat as well as the duration of the sailors' training. The case traces the dilemma faced by the favorite, ORACLE TEAM USA (OT...Starting at €8.20