Esta web utiliza cookies técnicas, de personalización y de análisis, propias y de terceros, para anónimamente facilitarle la navegación y analizar estadísticas del uso de la web. Obtener más información
Resultados de búsqueda
-
Office Depot E-Business (Abridged)
Venkataraman, S.; Bodily, Samuel E.; Cross, Tom; Chatterjee, SayanCaso DARDEN-BP-0524-EGobierno corporativoThis case is an excellent illustration of offline/online integration. Office Depot used its supply chain, systems integration, and existing offline channel strengths to overcome competitive online threats from pure Internet players and other office-products-category players. Students get to consider the critical strategic options for overall strategy, pricing, product line, promotion, and business integration.Desde 8,20 €
-
Barnes & Noble: Managing the E-Book Revolution
MacCormack, Alan; Dunn, Brian Kimball; Kemerer, Chris F.Caso HBS-613073-EServicios y operacionesThe case describes competition in the market for E-Books, and Barnes & Noble's Strategy in this industry. As a traditional retailer, B&N was challenged by the introduction of digital technologies that allow books to be published, distributed and sold to consumers electronically. New competitors like Amazon and Apple attacked the traditional industry structure, creating many uncertainties over the long term viability of traditional retailers. Amid...Desde 8,20 €
-
Barnes & Noble: Managing the E-Book Revolution, Teaching Note
MacCormack, Alan; Dunn, Brian Kimball; Kemerer, Chris F.Nota del Instructor HBS-614040-EServicios y operacionesTeaching Note for 613073.Desde 0,00 €
-
The F/A-18 F404 Engine: Getting Lean (A)
Brownlee, E. Richard II; Cross, Tom; Osterhoudt, Robert; Jaynes, C. J.; Pottinger, JeffCaso DARDEN-C-2268-EContabilidad y controlThe U.S. Navy Aircraft Intermediate Maintenance Depot (AIMD) Lemoore Power Plants Division (F404 engine maintenance) was a real mess. Not-Ready-For-Issue parts were everywhere. Division thru-put was poor, there were 30 F/A-18 aircraft with bare firewalls (no engines), the maintenance crews were working 12-hour days, manning was at 61% of authorized levels, reenlistment rates were an abysmal 50%, and crew morale was lousy. The Officer-in-Charge of...Desde 8,20 €
-
The F/A-18 F404 Engine: Getting Lean (A) and (B) - Teaching Note
Brownlee, E. Richard II; Cross, Tom; Osterhoudt, Robert; Jaynes, C. J.; Pottinger, JeffNota del Instructor DARDEN-C-2268TN-EContabilidad y controlTeaching note for product C-2268Desde 0,00 €
-
The F/A-18 F404 Engine: Getting Lean (B)
Brownlee, E. Richard II; Cross, Tom; Osterhoudt, Robert; Jaynes, C. J.; Pottinger, JeffCaso DARDEN-C-2269-EContabilidad y controlAfter the successful implementation of Lean manufacturing concepts at U.S. Navy Aircraft Intermediate Maintenance Depot (AIMD) Lemoore, particularly with regard to the maintenance processes for the F404 engine on the F/A-18 Hornet, these concepts have become the standard by which production across all AIMDs are measured. Now assigned to NAVAIR, the person responsible for these changes is eager to apply the lessons of AIMD Lemoore across the entir...Desde 5,74 €
-
Learning the Fine Art of Global Collaboration
MacCormack, Alan; Forbath, TheodoreArtículo HBS-F0801J-ECompanies that excel in managing partnerships for innovation put a great deal of effort into im-proving their ability to collaborate. Their plans address four critical areas.Desde 8,20 €
-
A Rush to Failure (HBR Case Study)
Cross, TomArtículo HBS-R1104X-EServicios y operacionesWhen a set of giant robotic arms developed for the International Space Station breaks down during a crisis, project manager Samantha Van Sant finds herself in the hot seat. Did her team compromise quality by pushing the contractors too hard on speed? How can she prevent future mishaps-should the arrangement with the contractors be renegotiated to include different incentives or more safeguards? Gary L. Moe, a director of McKinsey's Business Techn...Desde 8,20 €
-
Research In Motion: The Mobile OS Platform War, Teaching Note
MacCormack, Alan; Dunn, Brian; Kemerer, Chris F.Nota del Instructor HBS-614041-ETeaching Note for 613001.Desde 0,00 €
-
A Rush to Failure (Commentary for HBR Case Study)
Cross, TomArtículo HBS-R1104Z-EServicios y operacionesWhen a set of giant robotic arms developed for the International Space Station breaks down during a crisis, project manager Samantha Van Sant finds herself in the hot seat. Did her team compromise quality by pushing the contractors too hard on speed? How can she prevent future mishaps-should the arrangement with the contractors be renegotiated to include different incentives or more safeguards? Gary L. Moe, a director of McKinsey's Business Techn...Desde 8,20 €