Esta web utiliza cookies técnicas, de personalización y de análisis, propias y de terceros, para anónimamente facilitarle la navegación y analizar estadísticas del uso de la web. Obtener más información
Resultados de búsqueda
-
Office Depot E-Business (Abridged)
Venkataraman, S.; Bodily, Samuel E.; Cross, Tom; Chatterjee, SayanCaso DARDEN-BP-0524-EGobierno corporativoThis case is an excellent illustration of offline/online integration. Office Depot used its supply chain, systems integration, and existing offline channel strengths to overcome competitive online threats from pure Internet players and other office-products-category players. Students get to consider the critical strategic options for overall strategy, pricing, product line, promotion, and business integration.Desde 8,20 €
-
E Ink in 2008
Yoffie, David B.; Kim, ReneeCaso HBS-709443-EDirección estratégicaIn the fall of 2008, E Ink had positioned itself as a leader in electronic ink technology thanks to the launch of several eBook devices such as Amazon's Kindle. Yet E Ink still faced the question of how to turn its technology into a profitable business amid competing technologies and financial challenges.Desde 8,20 €
-
E Ink en 2008
Yoffie, David B.; Kim, ReneeCaso HBS-710S16Dirección estratégicaEn el otoño de 2008, E Ink ha posicionado como un líder en tecnología de tinta electrónica gracias a la puesta en marcha de varios dispositivos de libros electrónicos como el Kindle de Amazon. Sin embargo, E Ink aún se enfrenta a la cuestión de cómo convertir su tecnología en un negocio rentable en medio de tecnologías de la competencia y los retos financieros.Desde 8,20 €
-
The F/A-18 F404 Engine: Getting Lean (A)
Brownlee, E. Richard II; Cross, Tom; Osterhoudt, Robert; Jaynes, C. J.; Pottinger, JeffCaso DARDEN-C-2268-EContabilidad y controlThe U.S. Navy Aircraft Intermediate Maintenance Depot (AIMD) Lemoore Power Plants Division (F404 engine maintenance) was a real mess. Not-Ready-For-Issue parts were everywhere. Division thru-put was poor, there were 30 F/A-18 aircraft with bare firewalls (no engines), the maintenance crews were working 12-hour days, manning was at 61% of authorized levels, reenlistment rates were an abysmal 50%, and crew morale was lousy. The Officer-in-Charge of...Desde 8,20 €
-
The F/A-18 F404 Engine: Getting Lean (A) and (B) - Teaching Note
Brownlee, E. Richard II; Cross, Tom; Osterhoudt, Robert; Jaynes, C. J.; Pottinger, JeffNota del Instructor DARDEN-C-2268TN-EContabilidad y controlTeaching note for product C-2268Desde 0,00 €
-
The F/A-18 F404 Engine: Getting Lean (B)
Brownlee, E. Richard II; Cross, Tom; Osterhoudt, Robert; Jaynes, C. J.; Pottinger, JeffCaso DARDEN-C-2269-EContabilidad y controlAfter the successful implementation of Lean manufacturing concepts at U.S. Navy Aircraft Intermediate Maintenance Depot (AIMD) Lemoore, particularly with regard to the maintenance processes for the F404 engine on the F/A-18 Hornet, these concepts have become the standard by which production across all AIMDs are measured. Now assigned to NAVAIR, the person responsible for these changes is eager to apply the lessons of AIMD Lemoore across the entir...Desde 5,74 €
-
HTC Corp. in 2009 (Spanish Version)
Yoffie, David B.; Kim, ReneeCaso HBS-711S12Dirección estratégicacon sede en Taiwán HTC Corp. había convertido en el cuarto mayor fabricante de teléfonos inteligentes del mundo para el año 2009. CEO Peter Chou era extremadamente orgullosos de los logros notables que su compañía había hecho durante los últimos 12 años desde que comenzando como un fabricante desconocido de PDA para otras empresas. Sin embargo, Chou se enfrentó a varias decisiones con el fin de mover la compañía hacia adelante. La competencia por...Desde 8,20 €
-
A Rush to Failure (HBR Case Study)
Cross, TomArtículo HBS-R1104X-EServicios y operacionesWhen a set of giant robotic arms developed for the International Space Station breaks down during a crisis, project manager Samantha Van Sant finds herself in the hot seat. Did her team compromise quality by pushing the contractors too hard on speed? How can she prevent future mishaps-should the arrangement with the contractors be renegotiated to include different incentives or more safeguards? Gary L. Moe, a director of McKinsey's Business Techn...Desde 8,20 €
-
A Rush to Failure (Commentary for HBR Case Study)
Cross, TomArtículo HBS-R1104Z-EServicios y operacionesWhen a set of giant robotic arms developed for the International Space Station breaks down during a crisis, project manager Samantha Van Sant finds herself in the hot seat. Did her team compromise quality by pushing the contractors too hard on speed? How can she prevent future mishaps-should the arrangement with the contractors be renegotiated to include different incentives or more safeguards? Gary L. Moe, a director of McKinsey's Business Techn...Desde 8,20 €
-
The Evolution of Selling
Cross, TomNota técnica DARDEN-M-0811-EMarketingAppropriate for marketing classes. This note follows the evolution of selling starting with the skills set forth by Dale Carnigie in the 1950s through the 1970s followed by consultive selling in the 1980s and 1990s and the value-added selling of the 21st century.Desde 8,20 €