This website uses technical, customisation and analytical cookies, both first-party and third-party, to anonymously facilitate browsing and analyse statistics on use of the website. Learn more
Search results
-
Ebola: Managing to Save Lives
IESE InsightArticle ART-2676-EService and Operations ManagementA year after the outbreak of Ebola in West Africa in March 2014, health-care experts are cautiously optimistic that the epidemic appears to be slowing. Although the outlook is brighter than a year ago when the first case was detected in Guinea, there is still a long way to go and many lessons to be learned in managing a crisis of this scale, related to institutional shortfalls, international coordination, engagement with local stakeholders and, m...Starting at €8.20
-
Diseñando Tableros de Control
Corrales, José MaríaTechnical Note IAE-IAE-N117-05458-SPService and Operations ManagementLa presente nota técnica apunta a desarrollar principales puntos a tener en cuenta a la hora de diseñar un Tablero de Control. Dicho de otra manera, aquellos puntos de los que “no nos tenemos que olvidar” a la hora de diseñar o rediseñar un tablero de control.Starting at €8.20
-
Types of Processes (Spanish version)
Garvin, David A.Case HBS-606S34Service and Operations ManagementProvides a general introduction to the major types of production processes, their differences, and the implications that those differences have for management.Starting at €8.20
-
Los Grobo (Spanish version)
McAfee, Andrew; De Royere, AlexandraCase HBS-606S30Service and Operations ManagementEste caso se acompaña de un breve vídeo que se puede mostrar en clase o incluido en un Coursepack digital. Los instructores deben considerar el momento de hacer el video disponibles para los estudiantes, ya que puede revelar detalles clave de caso. Los Grobo, una empresa de grano de cultivo basados en la Argentina, debe decidir si se debe expandirse internacionalmente a la vecina Paraguay y Uruguay. Los Grobo ha construido una red de TI-equipad...Starting at €8.20
-
Rural Electrification in Nicaragua (Abridged)
Shiekh, Tahir; Gomez-Ibanez, JoseCase HBS-HKS483-EService and Operations ManagementIn the fall of 2001, officials of the National Energy Commission of Nicaragua were reviewing a pilot study of the options for electrification in three rural communities. Rural electrification was an important issue in Nicaragua since 40 percent of the population, mostly in rural areas, was without power. Many of those lived too far from the main high-voltage grid to be served easily with grid extensions. The consultants were recommending subsidiz...Starting at €8.20
-
Ébola: cuando una buena gestión salva vidas
IESE InsightArticle ART-2676Service and Operations ManagementEl ébola se ha cobrado más de diez mil víctimas en apenas un año y durante varios meses la epidemia amenazó con extenderse sin control por todo el mundo. ¿Cuáles han sido los principales errores y escollos en la gestión de la crisis?Starting at €8.20
-
Las dificultades del cambio: el modelo de Seguridad Social nicaragüense en transición
La Forgia G. M.; Ribera, Jaume; Rosenmöller, MagdaCase P-1009Service and Operations ManagementUn consultor contratado para preparar un informe examinando la viabilidad de la aplicación de un esquema similar al del MSP (Modelo de Salud Provisional, ya funcionando dentro del INSS - Instituto Nicaragüense de Seguridad Social) a poblaciones pobres no cubiertas por el INSS, llega a la conclusión que el esquema aún no puede ser transferido ya que puede requerir mejoras urgentes e importantes. El caso describe el progreso del MSP: crecimiento de...Starting at €8.20
-
Growing pains: the Nicaraguan social insurance health model in transition
La Forgia G. M.; Ribera, Jaume; Rosenmöller, MagdaCase P-1009-EService and Operations ManagementA consultant who has been contracted to draw up a report examining the feasibility of applying a model similar to that of the MSP (provisional health model, already operating within the INSS - Nicaraguan Institute of Social Security) to poor populations not covered by the INSS, reaches the conclusion that the model is not yet transferable as it may require urgent large-scale improvements. The case describes the MSP's progress: a 160% growth in th...Starting at €8.20