This website uses technical, customisation and analytical cookies, both first-party and third-party, to anonymously facilitate browsing and analyse statistics on use of the website. Learn more
Search results
-
Los fundamentos que catapultarán su empresa
Dávila Parra, Antonio; Foster, GeorgeArticle ART-1815Accounting and ControlLa vieja creencia de que los sistemas de gestión matan el espíritu emprendedor es errónea. Tal vez las empresas se conformen con menos cuando no llegan a los cien empleados, pero pueden crecer más rápido si cuentan desde el principio con unos sistemas de planificación y control internos sólidos. Los autores identifican ocho aspectos que deberían ser tenidos en cuenta por las empresas si quieren alcanzar un alto crecimiento: planificación y evalua...Starting at €8.20
-
How to Structure Companies for High Growth
Dávila Parra, Antonio; Foster, GeorgeArticle ART-1815-EAccounting and ControlThe old belief that management systems kill the entrepreneurial spirit is wrong. Perhaps when a company has fewer than 100 employees, a business can get by on less. But as the authors point out in this article, companies are actually able to grow faster provided that they have strong internal planning and control systems in place early on. They identify eight main categories that demand managerial attention if companies are ever to achieve high g...Starting at €8.20
-
The F/A-18 F404 Engine: Getting Lean (A)
Brownlee, E. Richard II; Cross, Tom; Osterhoudt, Robert; Jaynes, C. J.; Pottinger, JeffCase DARDEN-C-2268-EAccounting and ControlThe U.S. Navy Aircraft Intermediate Maintenance Depot (AIMD) Lemoore Power Plants Division (F404 engine maintenance) was a real mess. Not-Ready-For-Issue parts were everywhere. Division thru-put was poor, there were 30 F/A-18 aircraft with bare firewalls (no engines), the maintenance crews were working 12-hour days, manning was at 61% of authorized levels, reenlistment rates were an abysmal 50%, and crew morale was lousy. The Officer-in-Charge of...Starting at €8.20
-
Nuclear-Powered Aircraft Carrier Life-Cycle Cost Analysis
Cross, Tom; Sack, Robert J.; Pottinger, JeffCase DARDEN-C-2282-EAccounting and ControlIn 1996, to find ways to reduce operating costs as well as the costs of future acquisitions, the Navy began to assess various design concepts for a new class of aircraft carriers and to analyze life-cycle costs, not just the acquisition costs, as life-cycle cost implications were complex and would significantly impact current and future budgets. The acquisition decisions for the next-generation aircraft carrier, CVX, would largely be determined o...Starting at €8.20
-
The F/A-18 F404 Engine: Getting Lean (A) and (B) - Teaching Note
Brownlee, E. Richard II; Cross, Tom; Osterhoudt, Robert; Jaynes, C. J.; Pottinger, JeffTeaching Note DARDEN-C-2268TN-EAccounting and ControlTeaching note for product C-2268Starting at €0.00
-
The F/A-18 F404 Engine: Getting Lean (B)
Brownlee, E. Richard II; Cross, Tom; Osterhoudt, Robert; Jaynes, C. J.; Pottinger, JeffCase DARDEN-C-2269-EAccounting and ControlAfter the successful implementation of Lean manufacturing concepts at U.S. Navy Aircraft Intermediate Maintenance Depot (AIMD) Lemoore, particularly with regard to the maintenance processes for the F404 engine on the F/A-18 Hornet, these concepts have become the standard by which production across all AIMDs are measured. Now assigned to NAVAIR, the person responsible for these changes is eager to apply the lessons of AIMD Lemoore across the entir...Starting at €5.74
-
Naval Air Station Kodiak
Sack, Robert J.; McCarthy, J. D.; Pottinger, JeffCase DARDEN-C-2321-EAccounting and ControlCAPT Scott “Rattler” Smithson, weeks away from being relieved of duty at an air station that had achieved a performance record of virtual perfection, has received a surprise message from his Regional Commander that he fears will disrupt everything he’d worked so hard to achieve. The message indicates that the Commander Navy Installations Command (CNIC) headquarters had just issued a directive to all Regional Commanders to propose adjustments to r...Starting at €8.20
-
Prepárese para volver a crecer
Dávila Parra, Antonio; Foster, George; Liedtka J. M.; Prats Moreno, Mª Julia; Sosna, Marc; Thurik, RoyDossier DOS-6Accounting and Control, Economics, Entrepreneurship, Leadership and People ManagementNo importa el momento. Crecer siempre es posible. Abone el terreno, siembre creatividad y recogerá los frutos.Starting at €15.00
-
Growth: Making it Happen
Dávila Parra, Antonio; Foster, George; Liedtka J. M.; Prats Moreno, Mª Julia; Sosna, Marc; Thurik, RoyDossier DOS-6-EAccounting and Control, Economics, Entrepreneurship, Leadership and People ManagementNo matter the season, harvesting value is possible. Prepare the ground, sow creativity and reap the rewards.Starting at €15.00
-
Naval Station Anchorage
Pottinger, Jeff; McCarthy, J. D.; Sack, Robert J.Case DARDEN-C-2320-EAccounting and ControlCAPT Jake Branson is beginning his first week at work after assuming command of NAVSTA Anchorage. He has received a message from his Regional Commander indicating that Commander Naval Installations Command (CNIC) headquarters has just issued a requirement for all Regional Commanders to propose adjustments that would reduce its annual operating expenses by 3% (i.e., reduce its total annual authorized funding level by 3%) without sacrificing requir...Starting at €8.20