This website uses technical, customisation and analytical cookies, both first-party and third-party, to anonymously facilitate browsing and analyse statistics on use of the website. Learn more
Search results
-
Office Depot E-Business (Abridged)
Venkataraman, S.; Bodily, Samuel E.; Cross, Tom; Chatterjee, SayanCase DARDEN-BP-0524-ECorporate GovernanceThis case is an excellent illustration of offline/online integration. Office Depot used its supply chain, systems integration, and existing offline channel strengths to overcome competitive online threats from pure Internet players and other office-products-category players. Students get to consider the critical strategic options for overall strategy, pricing, product line, promotion, and business integration.Starting at €8.20
-
The F/A-18 F404 Engine: Getting Lean (A)
Brownlee, E. Richard II; Cross, Tom; Osterhoudt, Robert; Jaynes, C. J.; Pottinger, JeffCase DARDEN-C-2268-EAccounting and ControlThe U.S. Navy Aircraft Intermediate Maintenance Depot (AIMD) Lemoore Power Plants Division (F404 engine maintenance) was a real mess. Not-Ready-For-Issue parts were everywhere. Division thru-put was poor, there were 30 F/A-18 aircraft with bare firewalls (no engines), the maintenance crews were working 12-hour days, manning was at 61% of authorized levels, reenlistment rates were an abysmal 50%, and crew morale was lousy. The Officer-in-Charge of...Starting at €8.20
-
The F/A-18 F404 Engine: Getting Lean (A) and (B) - Teaching Note
Brownlee, E. Richard II; Cross, Tom; Osterhoudt, Robert; Jaynes, C. J.; Pottinger, JeffTeaching Note DARDEN-C-2268TN-EAccounting and ControlTeaching note for product C-2268Starting at €0.00
-
The F/A-18 F404 Engine: Getting Lean (B)
Brownlee, E. Richard II; Cross, Tom; Osterhoudt, Robert; Jaynes, C. J.; Pottinger, JeffCase DARDEN-C-2269-EAccounting and ControlAfter the successful implementation of Lean manufacturing concepts at U.S. Navy Aircraft Intermediate Maintenance Depot (AIMD) Lemoore, particularly with regard to the maintenance processes for the F404 engine on the F/A-18 Hornet, these concepts have become the standard by which production across all AIMDs are measured. Now assigned to NAVAIR, the person responsible for these changes is eager to apply the lessons of AIMD Lemoore across the entir...Starting at €5.74
-
ProTech, Inc. (Spanish Version)
Piper, Thomas R.; Ehrlich, Susan P.Case HBS-208S21FinanceUna empresa está considerando la eliminación de una línea de productos. Como parte de esa consideración, debe desarrollar posibles estrategias para el cierre de la división, e identificar las implicaciones económicas y no económicas de la estrategia. La situación se complica por la necesidad de la empresa para una infusión de capital propio.Starting at €8.20
-
Malden Mills (A) (Abridged)
Nohria, Nitin; Piper, Thomas R.Case HBS-410083-ELeadership and People ManagementCEO Aaron Feuerstein of Malden Mills decided to pay idled workers after a massive fire at his mill in 1995. Focuses on the decisions made post-fire and the rebuilding process and eventual bankruptcy of the company. Also outlines creditors' struggle to decide whether to lend Feuerstein additional funds to enable him to regain control of the company after emerging from bankruptcy.Starting at €8.20
-
Jones Electrical Distribution, Teaching Note
Piper, Thomas R.; DeVolder, JeffreyTeaching Note HBS-4180-EFinanceTeaching Note for 4179.Starting at €0.00
-
Assessing a Company's Future Financial Health, Teaching Note
Piper, Thomas R.Teaching Note HBS-911415-EFinanceTeaching Note for 911412.Starting at €0.00
-
Malden Mills (A), (B) and (Abridged), Teaching Note
Piper, Thomas R.; Sesia, AldoTeaching Note HBS-307018-ELeadership and People ManagementTeaching Note to (404-072) and (404-073).Starting at €0.00
-
A Rush to Failure (HBR Case Study)
Cross, TomArticle HBS-R1104X-EService and Operations ManagementWhen a set of giant robotic arms developed for the International Space Station breaks down during a crisis, project manager Samantha Van Sant finds herself in the hot seat. Did her team compromise quality by pushing the contractors too hard on speed? How can she prevent future mishaps-should the arrangement with the contractors be renegotiated to include different incentives or more safeguards? Gary L. Moe, a director of McKinsey's Business Techn...Starting at €8.20